FD — Future Development
Maximum lot coverage 15% by main buildings; 50% including accessory buildings, driveways and parking areas.
What the Waxahachie zoning ordinance says about lot coverage, district by district. Section numbers link to the official ordinance.
Maximum lot coverage 15% by main buildings; 50% including accessory buildings, driveways and parking areas.
Maximum lot coverage 20% by main and accessory buildings.
Maximum lot coverage 50% by main and accessory buildings.
Maximum lot coverage 50% by main and accessory buildings.
Maximum lot coverage 50% by main and accessory buildings.
Maximum lot coverage 35% by main buildings.
Maximum lot coverage 40% by main buildings and accessory buildings.
Maximum lot coverage 40% by main and accessory buildings.
Maximum lot coverage 40%.
Maximum lot coverage 50% if 50% of parking for MF portion is provided by attached, enclosed garages. 50% maximum. Lower lot coverage to match percentage of attached, enclosed garages..
Maximum lot coverage 35% by main and accessory buildings.
Maximum lot coverage 50% if 50% of parking for MF portion is provided by attached, enclosed garages. 50% maximum. Lower lot coverage to match percentage of attached, enclosed garages..
Maximum lot coverage 40% including accessory buildings.
Maximum lot coverage 40%.
Maximum lot coverage 40%.
Maximum lot coverage 95% for the main structure.
Maximum lot coverage 40% for the main structure.
Maximum lot coverage 50% for the main structure. 60% for all structures, accessory buildings and pavement.
Maximum lot coverage 65% for the main structure. 70% for all structures, accessory buildings and pavement.
Maximum lot coverage 65% for the main structure. 70% for all structures, accessory buildings and pavement.
Maximum lot coverage 50% for the main structure. 60% for all structures, accessory buildings and pavement.
$49/month. An email when a human-reviewed rule change is published for Waxahachie — with the citation, the date, and a link to the updated page. Quiet months get a short note confirming we checked. Cancel any time.
Alerts come only from reviewed changes, never from raw ordinance-site noise. Billing via Stripe; unsubscribe and cancellation links in every email.
Enter an address. We identify the zoning district and assemble what the ordinance says about it: permitted uses, dimensional rules, accessory structures, and the approval process.
District identification is free. The full brief is $79.