ZoningVerdict

Sample · Signed public report · version 1

Live Zoning File

134 S MAIN ST, ROCHESTER, MI, 48307

Preliminary verdict · Discretionary review

Based on the reviewed provisions, this project appears to require discretionary review.

Pack version 5. Last reviewed July 26, 2026.

Use permission

Stated use
Commercial office
District
CBD
Municipality
Rochester, MI

Permitted with restrictions

Permitted in CBD, subject to the Main Street ground-floor restriction in Section 1101 footnote (a).

The stated commercial office use was checked against the CBD district's permitted and special-use provisions.

  1. Section 1101(5) permits offices and office buildings of an executive, administrative, or professional nature in CBD. Footnote (a) creates a street-level exclusion for uses in subsections (5), (10), and (11) on properties fronting Main Street between 2nd Street and University Drive. The stated office use is permitted in CBD only subject to that Main Street ground-floor restriction.

    Article 11, Sec. 1101(5) and footnote (a)

Conditions, explicit

  1. 1.

    Front yard

    Ordinance-absent

    Front yard: ordinance-absent numeric value. The CBD front-yard cell says See following notes and does not state a standalone numeric front-yard setback. The proposed façade location therefore cannot be tested from a single numeric CBD setback.

    Article 20, Sec. 2000 schedule, CBD front-yard cell
  2. 2.

    Side yard

    Stated value

    Side yard: stated value with condition and exception. No side yards are required along interior lot lines, provided Building Code requirements for fire protection and separation, adequate light, and adequate ventilation are met. If those conditions are not met, zero side yard is not available.

    Article 20, Sec. 2004
  3. 3.

    Rear yard

    Stated value

    Rear yard: stated value. The CBD schedule lists a 10-foot minimum rear yard.

    Article 20, Sec. 2000 schedule, CBD rear-yard cell
  4. 4.

    Build-to / downtown frontage

    Depends on site dimensions

    Build-to / downtown frontage: depends on site dimensions. The ordinance does not state a separate numeric CBD build-to line; the CBD site-plan package must show the proposed building's relationship to existing buildings within 200 feet. The Planning Commission may waive the model, photograph, or video requirement for a modest building addition.

    Dimension needed: existing and proposed façade location relative to adjoining downtown buildings.

    Article 27, Sec. 2701(29)
  5. 5.

    Height and stories

    Stated value

    Height and stories: stated values. The CBD schedule lists a maximum building height of 35 feet and 3 stories.

    Article 20, Sec. 2000 schedule, CBD height cells
  6. 6.

    Height — West Walnut transition

    Depends on site dimensions

    Height, West Walnut transition exception. The maximum is 25 feet and 2 stories from the west side of Walnut Boulevard to the east right-of-way line of Pine Street, including the described extension south from Second Street to First Street. Applicability depends on the parcel's location within that transition area.

    Dimension needed: parcel location relative to Walnut Boulevard, Pine Street, Second Street, and First Street.

    Article 20, Sec. 2010; Sec. 2000 schedule footnote (c)
  7. 7.

    Lot coverage

    Ordinance-absent

    Lot coverage: ordinance-absent numeric value. The Article 20 schedule leaves the CBD maximum lot-coverage cell blank, so the reviewed schedule states no uniform numeric maximum building-coverage percentage for CBD.

    Article 20, Sec. 2000 schedule
  8. 8.

    Minimum lot area and width

    Ordinance-absent

    Minimum lot area and width: ordinance-absent numeric values. The Article 20 schedule leaves the CBD minimum lot-area and lot-width cells blank. Section 2007 separately supplies minimums for land without public water and sanitary sewer, but the reviewed schedule states no general numeric CBD minimum lot size.

    Article 20, Sec. 2000 schedule; Sec. 2007
  9. 9.

    Parking

    Depends on site dimensions

    Parking: depends on total gross floor area and office classification. The table requires 1 space per 300 square feet of gross floor area for business, professional, or general offices; 1 per 200 square feet for medical or dental offices; and 1 per 250 square feet for banks, plus any required stacking spaces.

    Dimension needed: total gross floor area, exact office classification, and credited downtown parking.

    Article 24, Sec. 2403, office parking row
  10. 10.

    Parking — downtown district posture

    Depends on site dimensions

    Parking Management District posture: depends on the parcel and credited parking. Section 2402 directs properties within the Parking Management District to City Code Chapter 28, Article V and allows the Planning Commission to modify numerical parking requirements on supporting evidence. Confirm the parcel's district status, on-site supply, public or leased-space credits, and any approved modification.

    Dimension needed: total gross floor area, exact office classification, and credited downtown parking.

    Article 24, Sec. 2402

Approval path

The review path for this building addition was checked against Rochester's site-plan, administrative-review, and variance provisions.

  1. Planning Commission site-plan review and approval is required before a building is constructed or structurally altered, including a change to an exterior wall's location, height, or area. A commercial office building addition therefore goes to the Planning Commission for site-plan review.

    Article 27, Sec. 2700(3)
  2. For CBD review, the site-plan submission must show the proposed building's relationship to existing buildings within 200 feet. A model, photograph, or video may be required, although the Planning Commission may waive that item for a modest addition.

    Article 27, Sec. 2701(29)
  3. If the proposal cannot meet a dimensional requirement, the Zoning Board of Appeals hears a dimensional variance under the practical-difficulties standard. The ZBA may not grant a use variance.

    Article 30, Sec. 3001

Checked and clear

Not covered

  • Recorded parcel instruments

    No title commitment, easements, private covenants, development agreement, or parcel-specific recorded restriction was supplied with this file.

  • Survey-dependent layout

    A sealed boundary/topographic survey was not supplied, so lot lines, existing building offsets, encroachments, and the proposed work footprint were not measured here.

  • Addition dimensions

    The addition plan did not supply surveyed front, side, and rear offsets, measured finished height, floor elevations, exact building footprint, or resulting lot coverage.

  • Parking calculation inputs

    Existing and proposed total gross floor area, exact office classification, on-site spaces, and downtown parking credits were not supplied.

Citations

  1. Article 11, Sec. 1101(5) and footnote (a)

    Rule 953357d1-6adc-4d59-9e85-93bb71aececa · version 2

    Source hash 50a7db6b3a72

    https://library.municode.com/mi/rochester/codes/zoning?nodeId=CIROZOOR_ART11CBCEBUDI_S1101PEPRUS
  2. Article 20, Sec. 2000 schedule, CBD front-yard cell

    Rule cb108c6c-7651-494b-a96f-82262a67d61f · version 2

    Source hash b46298e93d2f

    https://library.municode.com/mi/rochester/codes/zoning?nodeId=CIROZOOR_ART20SEARBUHEPLRE_S2000SCDIRE
  3. Article 20, Sec. 2004

    Rule 65c54e42-c7a5-4ecb-a565-6eefddcad8c1 · version 1

    Source hash b5f85e0baf37

    https://library.municode.com/mi/rochester/codes/zoning?nodeId=CIROZOOR_ART20SEARBUHEPLRE_S2004CB
  4. Article 20, Sec. 2000 schedule, CBD rear-yard cell

    Rule 8620b534-a43f-4191-9440-35f20260d696 · version 1

    Source hash 445c7751bc64

    https://library.municode.com/mi/rochester/codes/zoning?nodeId=CIROZOOR_ART20SEARBUHEPLRE_S2000SCDIRE
  5. Article 27, Sec. 2701(29)

    Rule 35f52ade-9035-4fbe-a2a8-873e2ab63c73 · version 1

    Source hash d1ccc6475b55

    https://library.municode.com/mi/rochester/codes/zoning?nodeId=CIROZOOR_ART27SIPLAP_S2701SIPLAPIN
  6. Article 20, Sec. 2000 schedule, CBD height cells

    Rule 8f5cd8d1-17cd-4fa3-9333-38050fee844e · version 2

    Source hash a0a578437e60

    https://library.municode.com/mi/rochester/codes/zoning?nodeId=CIROZOOR_ART20SEARBUHEPLRE_S2000SCDIRE
  7. Article 20, Sec. 2010; Sec. 2000 schedule footnote (c)

    Rule 64fc585b-8cf0-460f-87ef-4ce24a79b334 · version 1

    Source hash 503881f568cf

    https://library.municode.com/mi/rochester/codes/zoning?nodeId=CIROZOOR_ART20SEARBUHEPLRE_S2010WEWATRZO
  8. Article 20, Sec. 2000 schedule

    Rule 507bea3d-6a12-49fd-a714-d1d922d5b434 · version 2

    Source hash 3d9b3c069f73

    https://library.municode.com/mi/rochester/codes/zoning?nodeId=CIROZOOR_ART20SEARBUHEPLRE_S2000SCDIRE
  9. Article 20, Sec. 2000 schedule; Sec. 2007

    Rule f42227a9-bf58-4b2d-b0b8-03cdf91aecac · version 2

    Source hash be7bf6ce445c

    https://library.municode.com/mi/rochester/codes/zoning?nodeId=CIROZOOR_ART20SEARBUHEPLRE_S2000SCDIRE
  10. Article 24, Sec. 2403, office parking row

    Rule 2932ffb7-be15-4447-a089-a4590be60f5b · version 2

    Source hash 2c64e4a002b1

    https://library.municode.com/mi/rochester/codes/zoning?nodeId=CIROZOOR_ART24OREPALO_S2403TAREOREPASP
  11. Article 24, Sec. 2402

    Rule 6d59df24-a981-4a1e-aa5d-89522512e571 · version 2

    Source hash 65a29a6f7c08

    https://library.municode.com/mi/rochester/codes/zoning?nodeId=CIROZOOR_ART24OREPALO_S2402REOREPAGE
  12. Article 27, Sec. 2700(3)

    Rule da92143e-39a5-4a32-b3b0-fc78680456e3 · version 1

    Source hash 032097aa6cc1

    https://library.municode.com/mi/rochester/codes/zoning?nodeId=CIROZOOR_ART27SIPLAP_S2700AP
  13. Article 27, Sec. 2701(29)

    Rule 9eeec457-ae3f-4133-aef2-5c50f911cc60 · version 1

    Source hash 3041199ce6b0

    https://library.municode.com/mi/rochester/codes/zoning?nodeId=CIROZOOR_ART27SIPLAP_S2701SIPLAPIN
  14. Article 30, Sec. 3001

    Rule 2c14059c-e33b-4181-8d7c-b176b13c6cd5 · version 2

    Source hash b15eb420dc50

    https://library.municode.com/mi/rochester/codes/zoning?nodeId=CIROZOOR_ART30BOAP_S3001PODU

Version history

  1. Version 1DISCRETIONARY_REVIEW

ZoningVerdict summarizes public zoning regulations for information purposes. It is not legal advice, professional architectural or engineering services, or a substitute for confirmation with the municipality. Regulations change; verify before acting.

Evidence schema zoningverdict-preflight-evidence/1. JWS signature and cited source hashes are preserved in the versioned evidence bundle.

ZoningVerdict is a Verified Signals LLC product.