How much of my lot can be covered by buildings?
Maximum lot coverage is stated per district. Most single-family districts (AG/30, SF-ED, SF-20/26, SF-10/24) allow 45%, the TH townhouse district allows 60%, MH allows 50%, and the commercial and industrial districts allow 45% (NS, CR) or 50% (CC, BG, LI, HI). The MF multifamily figure does not state a coverage percentage and instead relies on setback, density, and building-separation standards. Confirm the cited figure before relying on a number.
Sources
Full text: Wylie ordinance on Municode. Applies to districts: SF-10/24, TH, CC.
Get the full picture for your property
Enter an address. We identify the zoning district and assemble what the ordinance says about it: permitted uses, dimensional rules, accessory structures, and the approval process.
District identification is free. The full brief is $79.